Load and reliability
Confirm measured demand, peak and critical load, operating hours, growth, outage history, current energy sources and the consequence of interruption.
MERGEN POWER
ENGINEERING GUIDE / FEASIBILITY CHECKLIST
A useful feasibility stage turns an operating problem into a traceable technical and commercial basis, compares complete system options and identifies what still has to be closed before investment.
Confirm measured demand, peak and critical load, operating hours, growth, outage history, current energy sources and the consequence of interruption.
Confirm available land or roof area, access, environmental constraints, cable routes, substations, existing switchgear, connection points, fuel interface and room for future expansion.
Compare complete architectures rather than individual products. State firm generation, renewable contribution, storage duty, reserve margin, network arrangement, controls and the expected operating sequence.
State CAPEX assumptions, delivered energy-cost drivers, fuel or grid price, utilisation, maintenance, availability, commercial model and the sensitivities that could materially change the decision.
Identify permitting or approval dependencies, procurement route, long-lead equipment, site enabling works, construction interfaces, commissioning requirements and the party responsible for each decision.
End with a clear preferred route or defined decision gate, the evidence supporting it, unresolved uncertainties, additional surveys or design work, and the conditions that should be met before capital commitment.
ENGINEERING BASIS / PUBLIC NOTE
This page explains the engineering logic used to frame an early power decision. Final sizing, commercial terms and detailed design depend on verified project data, site conditions and formal engineering work.
FIRST DECISION BASIS
These are the early inputs Mergen would normally test before treating a configuration as a credible project basis.
PROJECT QUESTIONS
It should prevent major assumptions from disappearing between engineering, commercial and delivery workstreams. The checklist keeps the load, interfaces, economics, approvals and open actions connected.
When the preferred architecture is supported by adequate evidence, key uncertainties have defined closure actions, the commercial basis is credible and the next design or procurement stage has a clear scope.
Where the evidence is sufficient, yes. Where it is not, the study should define the decision gate and the specific information required to select between the remaining options.
START WITH THE LOAD
Send the State or FCT, demand, operating hours, current supply and reliability requirement. Mergen can use that as the first engineering basis.