Project Input Checklist
This checklist is for early project definition. Approximate information is acceptable; Mergen will identify the missing data required for feasibility.
Load and operating duty
- Approximate peak load (kW / kVA / MW / MVA)
- Critical loads that cannot lose power
- Operating hours and days per week
- Expected growth over 1–5 years
Current supply
- Grid availability and voltage level
- Generator ratings and fuel use
- Existing solar or battery systems
- Known power-quality or outage problems
Site and delivery
- State / FCT and site type
- Available plant / roof / ground area
- Target date
- Project stage: concept, feasibility, development, procurement, existing asset
Commercial route
- CAPEX, PPA, financed asset or undecided
- Current energy cost if known
- Metering / tenant / offtaker structure where relevant
Send what you have to info@mergenpower.com.